常见水利工程项目划分,仅供参考 |
添加时间:2017/11/6 14:51:45 浏览次数: |
一个水利水电工程的建成,由施工准备工作开始到竣工交付使用,要经过若干工序、若干工种的配合施工。而工程质量的形成不仅取决于原材料、配件、产品的质量,同时也取决于各工种、工序的作业质量。因此,为了实现对工程全方位、全过程的质量控制和检查评定,按照工程形成的过程由点滴到局部再到整体的原则,考虑设计布局、施工布置等因素,将水利水电工程依次划分为单元工程、分部工程和单位工程。单元工程是进行日常质量考核和质量评定的基本单位。 The construction of a water conservancy and hydropower project starts from the preparatory work of the construction to the completion of the delivery of the use, through a number of processes, a number of types of work with the construction. The formation of engineering quality depends not only on the quality of raw materials, parts and products, but also on the quality of various types of work and processes. Therefore, in order to achieve the full range of engineering, the whole process of quality control and inspection and assessment, in accordance with the process of project formed by intravenous drip to local to the principle of overall consideration of layout design, construction layout and other factors, the water conservancy and hydropower engineering is divided into units of Engineering, engineering and engineering division. Unit engineering is the basic unit for daily quality assessment and quality assessment. 常见水利工程项目划分参考 Common water conservancy project division reference 一、水闸工程 I. Sluice Works 分部工程 Divisional Engineering 单元工程 Unit engineering 备注 Remarks 1.闸室段(土建) The 1. chamber section (Tu Jian) Δ基坑开挖及处理、闸底板(每孔或分缝)钢筋砼浇筑;各闸墩、岸墙砼浇筑;闸门(孔)门槽埋件与二期砼;回填土(单侧) The floor of the gate, and the excavation of foundation pit Delta (each hole or joint) reinforced concrete pouring; the pier, quay wall concrete pouring gate (hole); embedded parts and two concrete backfill (Dan Ce); 1. 闸基开挖必须执行隐蔽工程验收。 Acceptance of concealed works must be carried out in excavation of 1. sluice foundation. 2. 砼工程中有止水要求的,必须填表检测。 2. there is water stop requirement in concrete engineering, must fill in the form to check. 2.上部结构(墩顶以上) 2. superstructure (above pier top) 左右排架砼浇筑;活动闸门槽(孔)制作、安装;工作桥;栏杆预制、安装;人梯制作安装;闸牌名。 About bent concrete pouring; activity of gate slot (hole) production and installation work; bridge railings; prefabrication and installation; ladder production installation; gate name. 多孔闸,排架,工作桥可按孔分单元工程。 Porous gate, bent frame, work bridge can be divided into units according to the hole. 3.上、下游联接段 3. upstream and downstream connection section 上游铺盖(块)基坑开挖处理与浇筑;上、下游翼墙基坑开挖与砼底板;翼墙砌石;翼墙压顶;下游消力池(段、块)砼,护坦 Upstream blanket (block) processing and pouring excavation; the upper and lower wing wall excavation and concrete floor; wing wall masonry; wing wall top; downstream stilling basin (section, concrete block, apron) 砼有止水、排水要求的需填检测表。 Filling test table for concrete with water stop and drainage requirements. 4.交通桥 4. traffic bridge 每一桥墩、台;每一拱片(或预应力板梁)预制;每孔拱片(或板梁)安装,每孔(或全)桥面铺张;单边栏杆制作安装;每头引道工程 Each pier and platform; each arch piece (or prestressed plate beam) prefabricated; each hole arch (or plate beam) installation, each hole (or all) bridge deck extravagance; unilateral railing production and installation; each head road engineering 公路桥梁按照公路工程质量检验评定标准执行(JTGF80/1-2004) Highway bridges are carried out according to highway engineering quality inspection and evaluation standards (JTGF80/1-2004) 5.金属结构及机电设备安装 5. metal structure and mechanical and electrical equipment installation 闸门(扇)的制作,安装;启闭机安装(台套);自动(手动)搁门器(套)安装;高、低压线安装;控制、盘(块)安装;照明灯具安装;变压器(台套)安装。 Gate (fan) production, installation; hoist installation (sets); automatic (manual) put the door (sets) of high and low voltage line installation; installation; control, disc (block) installation; lighting installation; transformer installation (sets). 6.闸房 6. gate house 地基基础;主体工程楼、地面;门窗工程;屋面工程;装饰工程 Foundation; main engineering building; ground; doors and windows engineering; roofing engineering; Decoration Engineering 分项工程参见10。 Sub projects see 10. 二、泵站工程 Two. Pumping station project 分部工程 Divisional Engineering 单元工程 Unit engineering 备注 Remarks Δ1.泵室 Delta 1. pump room 泵室基础开挖及地基处理;Δ泵室底板砼浇筑(块);泵室墙砼浇筑;水泵梁(台)预制安装;隔墩砼(砖墙)浇筑;电机梁预制与安装 Pump room foundation excavation and foundation treatment; delta pump room floor concrete pouring (block); pump room wall concrete pouring; water pump beam (platform) prefabricated installation; pier concrete (brick wall) pouring; motor beam prefabrication and installation 1. 泵室墙一垛为一个单元工程包括进水孔和出水孔。 1. pump chamber wall of a stack as a unit project includes water inlet and the water outlet. 2.混流泵应加机泵砼基础浇筑 2. mixed flow pump should add pump concrete foundation pouring 2.进水段 2. inlet section 进水段铺盖(块)基坑开挖处理与浇筑;翼墙基坑开挖与砼底板、翼墙砌石、翼墙压顶;栏污栅的制作与安装(一扇)。 Water blanket (block) processing and pouring excavation; wing wall excavation and concrete floor, masonry wing wall, wing wall top; the manufacture and installation of the trashrack (a). 多孔闸,排架,工作桥可按孔分单元工程 Porous gate, bent frame, work bridge can be divided into units according to the hole 3.出水段(出水池) 3. outlet section (outlet tank) 同进水段单元工程划分 Unit engineering division of the same water inlet section Δ4.机电安装 Mechanical and electrical installation of delta 4. Δ水泵安装(台);电机安装(台);进出水管路安装(台);出水阀(拍门)安装;启重设备安装;真空泵(台套)安装(或充水装置安装);油漆 Water pump installation (table); motor installation (station); import and export water pipeline installation (station); outlet valve (tap door) installation; lifting equipment installation; vacuum pump (set) installation (or filling device installation); paint; paint; paint; water pump installation (or installation of water filling device); paint 5.电控制设备安装 Installation of 5. electric control equipment 配电柜安装;高低压线安装;控制台安装;自动设备安装;照明灯具(以一只开关系统)安装;红绿灯安装;变压器安装。 Installation of power distribution cabinet; installation of high and low pressure line; installation of console; installation of automatic equipment; installation of lighting lamp (with one switch system); installation of traffic light; installation of transformer. 6.泵站站房 6. pumping station 地基基础;主体工程楼、地面;门窗工程;屋面工程;装饰工程;行车梁(吊车梁) Foundation; main engineering building; ground; door and window engineering; roofing engineering; decoration engineering; crane beam (crane beam) 注:小型泵站可以不分分部工程,摘录以上有关分部中的单元工程即可。 Note: small pumping stations can be divided into sub units, the extraction of the above section of the unit project can be. 三、河道开挖疏浚工程 Three. Dredging works for river courses 分部工程 Divisional Engineering 单元工程 Unit engineering 备 注 Remarks 按河道断面变化或施工部署划定若干个分部工程 Several sub projects are delineated according to river channel section variation or construction deployment 实土开挖(水力冲挖、机械开挖)按按50~100米划分单元工程;水下疏浚按200米划分单元工程 The excavation of the soil (hydraulic excavation and mechanical excavation) is divided into 200 units according to 50~100 meters; the underwater dredging is divided into unit works according to the metre 1、根据实际情况,可按水上土方、水下土方划分分部工程; 1, according to the actual situation, according to the water earthwork, underwater earthwork division project; 2、弃土区、排泥场等作为检查项目 2, abandoned soil area, sludge dump and so on as inspection items 四、河道护岸、护坡工程 Four. River revetment and slope protection works 按每300米~400米延长米段 Extend the length of each metre from 300 meters to 400 meters 1. 砌石护岸(或砌块):每50~60延长米段的岸坡地基开挖及处理、砼底板浇筑(含齿沟)、砌石墙身及勾缝(含沉降缝制作)、砼压顶浇筑、回填土。 1. stone revetment (or block): every 50 ~ 60 meters to extend the slope section of the foundation excavation and treatment, concrete pouring floor (including teeth), wall body and pointing (including settlement production), concrete pouring, backfill surcharge. 2. 砼现浇护坡:每50~60延长米段岸坡地基开挖(填筑)、砼阻滑板及齿沟浇筑;砼护坡垫层铺设、砼护坡浇筑,砼护坡结顶。 2. concrete cast-in-place slope protection: every 50~60 meters length of slope foundation excavation (filling), concrete slide plate and tooth ditch pouring; concrete slope protection cushion laying, concrete slope protection pouring, concrete slope protection top. 3. 护坡护岸工程中的河埠工程需单列单元 3. the single unit of river port engineering in slope protection and Revetment Engineering 4. 浆(干)砌块石护坡按堤防单元工程质量评定与验收规程划分 Classification of quality evaluation and acceptance rules for 4. slurry (dry) block revetment in accordance with embankment unit 1. 齿沟沉必须用探钩检查其深度。 The depth of the 1. tooth groove must be checked with a hook. 2. 砼护坡分缝土工布埋置必须在砼护坡浇筑中说明 The 2. part concrete slope protection of geotextile buried in pouring concrete slope protection must be specified in the 3. 排水管必须在回填土表中说明,或在砼护面工程用表中说明,保持畅通。 3. drainage pipes must be in backfill note, or in the concrete cover engineering note, keep smooth. 五、堤防(标准海塘)工程 Five, dike (standard seawall engineering) 分部工程 Divisional Engineering 单元工程 Unit engineering 备注 Remarks 1.堤基处理 1. Foundation 堤基清理;堤基防渗;排水板插打等 Levee foundation seepage; cleaning; drain plug etc. 堤基处理与相应堤身单元工程划分应协调一致 Foundation and engineering division unit corresponding dike should be coordinated Δ2.堤身填筑 Delta 2. embankment construction 按填筑方式(吹填筑堤、碾压筑堤 According to the way of filling (fill embankment, Embankment Compaction |
上一页 新疆阿尔塔什水利枢纽工程金属结构启闭机及附属设备采购I标、II标、液压启闭机及附属设备采购I标、II标段四个标段 |
下一页 水利水电工程质量检验与评定项目划分原则及程序 |
Copyright © 技术支持:遨游网络