闸门的安装与调整: Installation and adjustment of gate: 1.在闸门安装前,首先检查各部连接部位的螺栓是否因运输装卸中造成的松动,如有松动应以加固。 1. Before installing the gate, first check whether the bolts in the connecting parts of each part are loosened due to transportation, loading and unloading. If loosened, they should be strengthened. 2.检查主立框与附框、主立框与横框、闸板与闸框连接的止水面是否有错位,如有错位则松动联结螺栓将止水面调整在同一平面内。 2. Check whether there is any misalignment of the water stop surface between the main frame and the accessory frame, the main frame and the transverse frame, the gate and the gate frame, and if there is misalignment, loosen the connecting bolt to adjust the water stop surface in the same plane. 3.闸门需要整体安装,严禁拆开安装。 3. Gates need to be installed as a whole, and disassembly and installation are strictly prohibited. 4.安装调整,闸门的一期工程基础布置图配钢筋并留一定的焊接长度。二期浇注前将闸门整体吊装就位,穿好各调整螺栓并拧紧,找好闸门前后、左右的正确位置,找直找平,用拉线加以固定,然后调整螺栓与工程钢筋焊接,再用塞尺检测确保各止水面的间隙在0.3mm以下,最后可进行二期浇注。 4. Installation and adjustment, the first phase of the sluice foundation layout with steel bars and a certain length of welding. Before the second stage of pouring, the whole gate is hoisted in place, the adjusting bolts are put on and tightened, the correct positions of the front, back and left of the gate are found, the straightening and leveling are made, and the bolts are fixed by pulling wires. Then the welding between the bolts and the engineering reinforcing bars is adjusted, and the gap between the water stops is ensured to be less than 0.3 mm by plug gauge detection. Finally, the second stage of pouring can be carried out. |
上一页 水利启闭机润滑钢丝绳的加油 |
下一页 清污机性能特点 |
Copyright © 技术支持:遨游网络